HMO landlord · Independent inspection
Independent EICR and reporting for an HMO landlord
Independent inspection and reporting for an HMO landlord after paying over £2,000 for remedial works, identifying defects that remained unresolved.
Request a quote ↗Speak with Joshua about a similar project on 07387 174998.
The work
An HMO landlord contacted us after paying over £2,000 for remedial works identified in a previous EICR, with concerns that the agreed repairs had not been completed.
We reviewed the existing certification and independently inspected and tested the installation. Our findings included:
- Open circuit protective conductor (CPC) rings on three ring final circuits.
- No CPC continuity on the boiler radial circuit.
- A disconnected bonding conductor.
- Exposed cable cores.
- A loose pull-cord switch.
We provided the landlord with a full report detailing the outstanding defects and identifying which items from the original EICR had not been rectified, giving them a clear, documented record of the installation’s condition.
Project photographs
Select a photograph to view the full image.